Difference between revisions of "Advertising"

From SkullSpace Wiki
Jump to navigation Jump to search
m
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
{{Archived}}
 +
 
== Signs installed (Thanks to these organizations)==
 
== Signs installed (Thanks to these organizations)==
 
*Syrotech on Gomez/Higgins
 
*Syrotech on Gomez/Higgins
 
*Itech Systems on Regent (2)
 
*Itech Systems on Regent (2)
*Computer Avenue on St. James and Dakota
+
*Computer Avenue on St. James and Dakota - may have been removed?
 
*IC Enternet on St. Mary's
 
*IC Enternet on St. Mary's
 
*U of M in Engineering building (2). At UMSU Center they're taken down every 2 weeks, last installed in June.
 
*U of M in Engineering building (2). At UMSU Center they're taken down every 2 weeks, last installed in June.
 
*U of W across from info booth. Will install in their new science building in September.
 
*U of W across from info booth. Will install in their new science building in September.
 
*RRC at Princess campus (6 signs x posted 4 weeks = 20$) until August?
 
*RRC at Princess campus (6 signs x posted 4 weeks = 20$) until August?
 
+
*AYB is giving us banner space and we can put up signs at Baselan in May.
  
 
== Refused/in limbo/to do ==
 
== Refused/in limbo/to do ==
*Computer Boulevard: need to check if they accepted
+
*Computer Boulevard: didn't get a reply, so no
 
*U of M Science buildings: didn't hear back from them
 
*U of M Science buildings: didn't hear back from them
*RRC Route 90 campus: SA were all gone by 3pm (government workers in training?), need to go back when they're there to ask permission.
+
*RRC Route 90 campus: installed sksp/AW signs in august, they stay for 2 weeks?
 
*WTC: re-opens sept 7.
 
*WTC: re-opens sept 7.
  
 
== Contacts ==
 
== Contacts ==
*e-mailed about SkSp to Mindset, SmartPartners (dead?), ITC.
+
*e-mailed about SkSp to Mindset, SmartPartners (dead?), ITC, ICTAM.
 +
 
 +
[[Category:Advertising]]

Latest revision as of 20:54, 1 June 2014

Info.png This page has been archived. All information in this article is historical.

Signs installed (Thanks to these organizations)

  • Syrotech on Gomez/Higgins
  • Itech Systems on Regent (2)
  • Computer Avenue on St. James and Dakota - may have been removed?
  • IC Enternet on St. Mary's
  • U of M in Engineering building (2). At UMSU Center they're taken down every 2 weeks, last installed in June.
  • U of W across from info booth. Will install in their new science building in September.
  • RRC at Princess campus (6 signs x posted 4 weeks = 20$) until August?
  • AYB is giving us banner space and we can put up signs at Baselan in May.

Refused/in limbo/to do

  • Computer Boulevard: didn't get a reply, so no
  • U of M Science buildings: didn't hear back from them
  • RRC Route 90 campus: installed sksp/AW signs in august, they stay for 2 weeks?
  • WTC: re-opens sept 7.

Contacts

  • e-mailed about SkSp to Mindset, SmartPartners (dead?), ITC, ICTAM.