* To move all the items from 125 Adelaide to wherever we're going, during the last week of November. | * To move all the items from 125 Adelaide to wherever we're going, during the last week of November. | ||
* Leader: Mak | * Leader: Mak | ||
Line 7: | Line 7: | ||
* Ben: Garage | * Ben: Garage | ||
* Lynn: Basement | * Lynn: Basement | ||
+ | * Richard: Garage | ||
+ | * Nate: Garage | ||
+ | * G.Mike: Garage (needs rearranging first, 9-12 man hours necessary before usable) | ||
==Vehicles== | ==Vehicles== | ||
Line 12: | Line 15: | ||
* Justin: Truck | * Justin: Truck | ||
* Mak: Truck | * Mak: Truck | ||
− | |||
− | |||
==Labour== | ==Labour== | ||
− | * David S. ( | + | The team is 12 pre-approved individuals: |
− | * | + | |
− | * Mak | + | # Alex |
− | * | + | # Colin S. |
− | + | # David C. | |
− | + | # David S. | |
+ | # Ian | ||
+ | # Jay | ||
+ | # Justin | ||
+ | # Mak | ||
+ | # Mark C. | ||
+ | # Michael K. | ||
+ | # Nate | ||
+ | # Richard | ||
+ | |||
+ | Nobody else may participate in demolition, all other SkullSpace fobs will be deactivated Friday at 1600h. | ||
+ | |||
+ | ==Tools== | ||
+ | |||
+ | * Drills | ||
+ | ** 3 cordless (Mak) | ||
+ | ** 1 corded (Mak) | ||
+ | |||
+ | * Power | ||
+ | |||
+ | * Lighting | ||
+ | ** Ground-level 500w halogen (David S.) | ||
+ | ** Ground-level halogen (Mak) | ||
+ | |||
+ | * Other | ||
+ | ** Sledges | ||
+ | *** 5 lb (David S.) | ||
+ | *** 5 lb (Mak) | ||
+ | ** Crowbars | ||
+ | *** 2' (David S.) | ||
+ | *** 2x (Mak) | ||
+ | |||
+ | ==Plan== | ||
+ | |||
+ | Be there on Friday at 1600h (being a couple hours late is okay). | ||
+ | |||
+ | Currently, the plan is to move all the items we're keeping (some benches, all appliances) from Adelaide to Donald on Friday. Saturday/Sunday will be demolition. If we can do demolition fast enough, Sunday will include dump runs, subject to availability of vehicles and things being open. | ||
+ | [[Category:Strikeforces]] |
Latest revision as of 20:15, 29 May 2014
- To move all the items from 125 Adelaide to wherever we're going, during the last week of November.
- Leader: Mak
Contents
Storage Space
- Ben: Garage
- Lynn: Basement
- Richard: Garage
- Nate: Garage
- G.Mike: Garage (needs rearranging first, 9-12 man hours necessary before usable)
Vehicles
- Justin: Truck
- Mak: Truck
Labour
The team is 12 pre-approved individuals:
- Alex
- Colin S.
- David C.
- David S.
- Ian
- Jay
- Justin
- Mak
- Mark C.
- Michael K.
- Nate
- Richard
Nobody else may participate in demolition, all other SkullSpace fobs will be deactivated Friday at 1600h.
Tools
- Drills
- 3 cordless (Mak)
- 1 corded (Mak)
- Power
- Lighting
- Ground-level 500w halogen (David S.)
- Ground-level halogen (Mak)
- Other
- Sledges
- 5 lb (David S.)
- 5 lb (Mak)
- Crowbars
- 2' (David S.)
- 2x (Mak)
- Sledges
Plan
Be there on Friday at 1600h (being a couple hours late is okay).
Currently, the plan is to move all the items we're keeping (some benches, all appliances) from Adelaide to Donald on Friday. Saturday/Sunday will be demolition. If we can do demolition fast enough, Sunday will include dump runs, subject to availability of vehicles and things being open.