Difference between revisions of "Advertising"
Jump to navigation
Jump to search
m |
|||
Line 2: | Line 2: | ||
*Syrotech on Gomez/Higgins | *Syrotech on Gomez/Higgins | ||
*Itech Systems on Regent (2) | *Itech Systems on Regent (2) | ||
− | *Computer Avenue on St. James and Dakota | + | *Computer Avenue on St. James and Dakota - may have been removed? |
*IC Enternet on St. Mary's | *IC Enternet on St. Mary's | ||
*U of M in Engineering building (2). At UMSU Center they're taken down every 2 weeks, last installed in June. | *U of M in Engineering building (2). At UMSU Center they're taken down every 2 weeks, last installed in June. | ||
*U of W across from info booth. Will install in their new science building in September. | *U of W across from info booth. Will install in their new science building in September. | ||
*RRC at Princess campus (6 signs x posted 4 weeks = 20$) until August? | *RRC at Princess campus (6 signs x posted 4 weeks = 20$) until August? | ||
− | + | *AYB is giving us banner space and we can put up signs at Baselan in May. | |
== Refused/in limbo/to do == | == Refused/in limbo/to do == | ||
− | *Computer Boulevard: | + | *Computer Boulevard: didn't get a reply, so no |
*U of M Science buildings: didn't hear back from them | *U of M Science buildings: didn't hear back from them | ||
− | *RRC Route 90 campus: | + | *RRC Route 90 campus: installed sksp/AW signs in august, they stay for 2 weeks? |
*WTC: re-opens sept 7. | *WTC: re-opens sept 7. | ||
Revision as of 19:19, 20 January 2012
Signs installed (Thanks to these organizations)
- Syrotech on Gomez/Higgins
- Itech Systems on Regent (2)
- Computer Avenue on St. James and Dakota - may have been removed?
- IC Enternet on St. Mary's
- U of M in Engineering building (2). At UMSU Center they're taken down every 2 weeks, last installed in June.
- U of W across from info booth. Will install in their new science building in September.
- RRC at Princess campus (6 signs x posted 4 weeks = 20$) until August?
- AYB is giving us banner space and we can put up signs at Baselan in May.
Refused/in limbo/to do
- Computer Boulevard: didn't get a reply, so no
- U of M Science buildings: didn't hear back from them
- RRC Route 90 campus: installed sksp/AW signs in august, they stay for 2 weeks?
- WTC: re-opens sept 7.
Contacts
- e-mailed about SkSp to Mindset, SmartPartners (dead?), ITC, ICTAM.