* To move all the items from 125 Adelaide to wherever we're going, during the last week of November.
 
* To move all the items from 125 Adelaide to wherever we're going, during the last week of November.
 
* Leader: Mak
 
* Leader: Mak
Line 15: Line 15:
 
* Justin: Truck
 
* Justin: Truck
 
* Mak: Truck
 
* Mak: Truck
* Ron: Semi
 
** Stepdad has three semi trailers. He drives around with them empty all day. We could use them for moving and also storage.
 
  
 
==Labour==
 
==Labour==
Line 40: Line 38:
  
 
* Drills
 
* Drills
 +
** 3 cordless (Mak)
 +
** 1 corded (Mak)
  
 
* Power
 
* Power
Line 45: Line 45:
 
* Lighting
 
* Lighting
 
** Ground-level 500w halogen (David S.)
 
** Ground-level 500w halogen (David S.)
 +
** Ground-level halogen (Mak)
  
 
* Other
 
* Other
Line 52: Line 53:
 
** Crowbars
 
** Crowbars
 
*** 2' (David S.)
 
*** 2' (David S.)
 +
*** 2x (Mak)
 +
 +
==Plan==
 +
 +
Be there on Friday at 1600h (being a couple hours late is okay).
 +
 +
Currently, the plan is to move all the items we're keeping (some benches, all appliances) from Adelaide to Donald on Friday. Saturday/Sunday will be demolition. If we can do demolition fast enough, Sunday will include dump runs, subject to availability of vehicles and things being open.
 +
[[Category:Strikeforces]]

Latest revision as of 20:15, 29 May 2014

Info.png This page has been archived. All information in this article is historical.
  • To move all the items from 125 Adelaide to wherever we're going, during the last week of November.
  • Leader: Mak

Storage Space

  • Ben: Garage
  • Lynn: Basement
  • Richard: Garage
  • Nate: Garage
  • G.Mike: Garage (needs rearranging first, 9-12 man hours necessary before usable)

Vehicles

  • Justin: Truck
  • Mak: Truck

Labour

The team is 12 pre-approved individuals:

  1. Alex
  2. Colin S.
  3. David C.
  4. David S.
  5. Ian
  6. Jay
  7. Justin
  8. Mak
  9. Mark C.
  10. Michael K.
  11. Nate
  12. Richard

Nobody else may participate in demolition, all other SkullSpace fobs will be deactivated Friday at 1600h.

Tools

  • Drills
    • 3 cordless (Mak)
    • 1 corded (Mak)
  • Power
  • Lighting
    • Ground-level 500w halogen (David S.)
    • Ground-level halogen (Mak)
  • Other
    • Sledges
      • 5 lb (David S.)
      • 5 lb (Mak)
    • Crowbars
      • 2' (David S.)
      • 2x (Mak)

Plan

Be there on Friday at 1600h (being a couple hours late is okay).

Currently, the plan is to move all the items we're keeping (some benches, all appliances) from Adelaide to Donald on Friday. Saturday/Sunday will be demolition. If we can do demolition fast enough, Sunday will include dump runs, subject to availability of vehicles and things being open.